Projects
Meishan municipal virtual power plant enters trial operation
Initial storage resources and adjustable loads have been connected; the platform aggregates solar, storage, charging facilities and industrial loads for coordinated operation.
Recently, the Meishan municipal virtual power plant formally entered trial operation. The project has completed renovation of the smart operations centre, equipment commissioning and overall platform-function commissioning, as well as the connection of the first storage resources and adjustable loads. This marks a key step for Meishan in establishing a ‘1+N’ municipal virtual-power-plant management system and advancing coordinated development of generation, grid, loads and storage.
The virtual power plant adopts a four-layer ‘cloud–network–edge–device’ technical architecture, developing municipal operations and load-management platforms interconnected with the provincial platform and grid dispatch systems. Centred on AI-assisted decision-making, it aggregates dispersed resources including distributed photovoltaics, storage, charging points and adjustable industrial loads into a regional intelligent energy-management system with unified dispatch, trading and settlement. It also establishes a complete set of operating rules covering resource management, dispatch procedures, capability validation and revenue allocation.
The Meishan municipal virtual power plant is an important component of the Industrial Development Group's top-level energy-sector design and an important initiative in upgrading that sector from individual project investment and operation to an integrated ‘generation, grid, loads and storage’ operating system. Trial operation is a key step towards platform-based, systematic and intensive operation, providing a core lever for the group's transformation into an ‘integrated industrial services group’. It will also expand into new businesses including electricity trading and energy-data services, cultivating new growth drivers for high-quality development. At the same time, the virtual power plant is key infrastructure for addressing structural imbalances in Meishan's electricity supply and demand and supporting its ‘strong manufacturing city’ strategy. Once completed, it will use flexible regulation to dispatch storage discharge and guide businesses to shift consumption away from peaks, intelligently store electricity during low-demand periods and prioritise green-electricity consumption, effectively improving grid regulation capabilities and local new-energy consumption. Next, the platform will comprehensively identify and connect generation, grid, load and storage resources across the city, establish a coordinated ‘operator–resource provider’ operating model, and organise aggregated resources to participate in market-based demand response and ancillary services, providing strong support for Meishan's ‘strong manufacturing city’ strategy and green, low-carbon transition.




