Mounting & roofs
Jordan carton-factory rooftop: LONGi’s published project account
A source-linked summary of LONGi’s reported 1 MW rooftop deployment in Jordan.
LONGi reported a 1 MW rooftop deployment at Izdehar Carton Factory in Jordan, using Hi-MO X10 modules. Its August 2025 case account identifies Magic Energy as the installer.
Evidence and limits
This record summarises the manufacturer’s project account. The source does not provide an independently audited operating dataset for platform verification. No generation or savings guarantee is inferred.
Research relevance
The case offers a starting point for studying an industrial roof application and the associated module family. Roof design, electrical configuration and economic assumptions remain project-specific.
Sources & record information
Manufacturer-reported case; independent operating dataset not supplied
LONGi case account, August 8, 2025 ↗We distinguish published claims from independently verified performance. Please flag outdated information through a platform inquiry.