Shanxi Post connects Taiyuan's 2.2 MWp rooftop PV and 1 MW/2.088 MWh storage project
The November 17, 2026 report says Shanxi Post's first PV project began grid-connected generation on November 13. The Taiyuan mail-processing site combines 2.2 MWp of rooftop PV with 1 MW/2.088 MWh of storage; annual generation and savings figures are estimates.






